· TX legislature · 89R
Relating to the authority of the Railroad Commission of Texas and the Public Utility Commission of Texas to address a failure by an operator to maintain an electrical power line serving a well site or certain surface facilities in accordance with the National Electrical Code.
- Sponsor
- Rafael Anchía (D-TX)
- Introduced
- 2025-03-06
- Policy area
- Energy
- Latest action
- Effective on 9/1/25
Digging through Congress... 🔍