S. 8114 · NY legislature 2025-2026
Relates to the siting of new electric transmission lines
Provides that in the siting of new electric transmission facilities, including high-voltage transmission lines, the following corridors shall be utilized in the following order of priority in accordance with feasibility of economic and engineering considerations, reliability of the electric system and the protection of the environment: existing utility corridors; highway (interstate, freeway and state trunk) and railroad corridors; recreational trails, to the extent that t…
- Sponsor
- Jeremy Cooney (D-NY)
- Introduced
- 2025-05-15
- Cosponsors
- 0
- Organizations that lobbied on this bill
- 3
- Latest action
- 2026-04-30: PRINT NUMBER 8114A