SB 1482 · FL legislature 2026
Electric Utility 10-year Site Plans
Electric Utility 10-year Site Plans; Revising requirements for estimates included in the 10-year site plan; requiring the Florida Public Service Commission to issue a final order within a specified timeframe after receiving a proposed plan; authorizing the commission to reject such plan under certain circumstances; requiring electric utilities to submit a revised plan within a specified timeframe upon such rejection, etc.
- Sponsor
- Mack Bernard (D-FL)
- Introduced
- 2026-01-08
- Cosponsors
- 0
- Policy area
- Energy
- Latest action
- 2026-03-13: Died in Regulated Industries
Digging through Congress... 🔍