Optimizing Colorado Electric Transmission System
Current law requires the Colorado electric transmission authority (authority) to conduct a study on the need for expanded transmission capacity in the state and prepare a final report of the study on or before January 31, 2025. Section 2 of the bill authorizes the authority to conduct the study on a recurring basis and requires the authority to present a statewide transmission plan, based on the results of the study, to the Colorado public utilities commission (commission)…
- Sponsor
- Dylan Roberts (D-CO)
- Introduced
- 2025-04-17
- Cosponsors
- 0
- Policy area
- Energy
- Latest action
- 2025-02-05: Introduced In Senate - Assigned to Transportation & Energy