SB 422 · IN legislature 2025
Advanced transmission technologies.
Defines "advanced transmission technologies" as software or hardware technologies that increase the capacity, efficiency, reliability, or safety of an existing or new electric transmission facility. Provides that in any integrated resource plan (IRP) filed with the Indiana utility regulatory commission (IURC) after December 31, 2025, an electric utility that owns or operates a transmission or distribution system must include a description of the potential use of, or invest…
- Sponsor
- Ed Soliday (R-IN)
- Introduced
- 2025-01-13
- Cosponsors
- 3
- Policy area
- Energy
- Latest action
- 2025-03-31: Signed by the Governor
Digging through Congress... 🔍