Skip to main content
MyCapitol LogoMyCapitol

SF 102 · WY legislature 2026

Wyoming energy transmission study.

This act requires the Wyoming Energy Authority to complete a transmission planning study concerning Wyoming's transmission system and the potential growth of that system. The act requires the Energy Authority to complete the study in two (2) phases. Phase one (1) must analyze the impacts of three potential load-growth scenarios on Wyoming's current system, including a model of Wyoming's transmission needs and the consideration of advanced transmission technologies and elec…

Introduced
2026-02-10
Cosponsors
6
Policy area
Energy
Latest action
2026-03-06: Assigned Chapter Number 58

Digging through Congress... 🔍